10 rail sections out of service for over a month in flood-hit region
Torrential rain severed train lines operated by West Japan Railway Co. in western Japan. everal months will be needed to restore all train services on the Sanyo Line in the flood-damaged Chugoku region, West Japan Railway Co. (JR West) said.For the Geibi Line, it will take almost a year for full operations to resume.JR West said July 11 that nine of the railway lines it runs in western Japan were damaged in the torrential rain. Ten now-inoperable sections will require more than a month of repair work.The Sanyo Shinkansen Line escaped serious damage in the disaster and has been operating between Shin-Osaka Station in Osaka Prefecture and Hakata Station in Fukuoka Prefecture.





ライセンスの購入
商品の使用用途、使用期間、使用国・地域等の条件に基づいたライセンス。
詳細
制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。No sales to customers in China or Korea
クレジット:
報道写真番号:
998042580
コレクション:
The Asahi Shimbun Video
作成日:
2018年07月11日(水)
アップロード日:
ライセンスタイプ:
ライツレディ
リリース情報:
リリースされていません。 詳細情報
クリップの長さ:
00:00:40:20
場所:
Hiroshima, Japan
マスター:
QuickTime 8-bit Photo-JPEG HD 1920x1080 29.97p
ソース:
The Asahi Shimbun Video
オブジェクト名:
20180711jrsanyolinebroken.mov