London 2012 Olympics: Site construction delayed as travellers wait to be re-housed

London 2012 Olympics: Site construction delayed as travellers wait to be re-housed; ENGLAND: London: Newham: EXT Workmen in excavated hole in road surface Pre-fabricated houses on new travellers' site Excavating digger at work Pre-fabricated houses with warehouse (factory) in background Workman along with length of drainage pipe
London 2012 Olympics: Site construction delayed as travellers wait to be re-housed; ENGLAND: London: Newham: EXT Workmen in excavated hole in road surface Pre-fabricated houses on new travellers' site Excavating digger at work Pre-fabricated houses with warehouse (factory) in background Workman along with length of drainage pipe
ライセンスの購入

商品の使用用途、使用期間、使用国・地域等の条件に基づいたライセンス。

詳細

制限:
制作日から4日間は、英国およびアイルランドの全国・地域のテレビやラジオニュースで素材を使用することはできません。ITNのアナウンサーやレポーターの音声または映像が入っている場合、素材のご使用には事前承諾が必要となります。ゲッティイメージズの担当者までお問い合わせください。No use by regional TV or radio in UK and Ireland until 3 days after date of creation. Prior approval required if clip features ITN newsreader or reporter, please contact your local Getty Images representative.
クレジット:
報道写真番号:
670246992
コレクション:
ITN
作成日:
2007年10月02日(火)
アップロード日:
ライセンスタイプ:
ライツレディ
リリース情報:
リリースされていません。 詳細情報
クリップの長さ:
00:00:18:20
マスター:
QuickTime 8-bit Photo-JPEG SD 720x576 25i
オリジナルショット:
576 25i
ソース:
ITN
オブジェクト名:
t02100712_0.mov