TEPCO Removes Canopy Panel From Fukushima Reactor Building

OKUMA, JAPAN - JULY 28: The interior of the No. 1 reactor building of the Tokyo Electric Power Co (TEPCO)'s Fukushima Daiichi Nuclear Power Plant can be seen from above after a canopy panel was removed on July 28, 2015 in Okuma, Fukushima, Japan. Workers using a giant crane lifted away the first of six canopy panels, each measuring 40 meters long and 7 meters wide. The utility plans to remove the remaining five panels from next week. The removal of the canopy will allow TEPCO to clear debris inside the building, possibly in the latter half of fiscal 2016. That process should pave the way for the removal of nuclear fuel rods from the spent fuel pool in the building. TEPCO initially planned to start removing the canopy panels from the No. 1 reactor building in summer 2014, but the schedule was delayed because a large amount of radioactive substances was released into the environment when the utility removed debris from the No. 3 reactor building in August 2013. (Photo by The Asahi Shimbun via Getty Images)
OKUMA, JAPAN - JULY 28: The interior of the No. 1 reactor building of the Tokyo Electric Power Co (TEPCO)'s Fukushima Daiichi Nuclear Power Plant can be seen from above after a canopy panel was removed on July 28, 2015 in Okuma, Fukushima, Japan. Workers using a giant crane lifted away the first of six canopy panels, each measuring 40 meters long and 7 meters wide. The utility plans to remove the remaining five panels from next week. The removal of the canopy will allow TEPCO to clear debris inside the building, possibly in the latter half of fiscal 2016. That process should pave the way for the removal of nuclear fuel rods from the spent fuel pool in the building. TEPCO initially planned to start removing the canopy panels from the No. 1 reactor building in summer 2014, but the schedule was delayed because a large amount of radioactive substances was released into the environment when the utility removed debris from the No. 3 reactor building in August 2013. (Photo by The Asahi Shimbun via Getty Images)
TEPCO Removes Canopy Panel From Fukushima Reactor Building
制限付きの商品
このイメージのライセンスはオンラインでは発行できません。 このイメージのラインセンスをご希望の場合は、お問い合わせください。

詳細

制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。
クレジット:
The Asahi Shimbun / 寄稿者
報道写真番号:
482178646
コレクション:
The Asahi Shimbun
作成日:
2015年07月28日(火)
アップロード日:
ライセンスタイプ:
リリース情報:
リリースされていません。 詳細情報
ソース:
The Asahi Shimbun
オブジェクト名:
86415367
最大ファイルサイズ:
3000 x 1914 px (25.40 x 16.21 cm) - 300 dpi - 5 MB