Easter Seals Colorado Building Renovation

LAKEWOOD, CO - JANUARY 7: George Fitterer, left, Sharon Barbarick, center, and Colleen Kelly grab pool noodles to float as they stretch during an arthritis exercise class in the heated pool at Easter Seals Colorado in Lakewood, Colorado on January 7, 2015. The Lakewood Easter Seals has received a $50,000 grant from the Boettcher Foundation to renovate it's existing building. (Photo by Seth McConnell/The Denver Post via Getty Images)
LAKEWOOD, CO - JANUARY 7: George Fitterer, left, Sharon Barbarick, center, and Colleen Kelly grab pool noodles to float as they stretch during an arthritis exercise class in the heated pool at Easter Seals Colorado in Lakewood, Colorado on January 7, 2015. The Lakewood Easter Seals has received a $50,000 grant from the Boettcher Foundation to renovate it's existing building. (Photo by Seth McConnell/The Denver Post via Getty Images)
Easter Seals Colorado Building Renovation
ライセンスの購入
どんな用途に素材を使えますか?
¥38,500
JPY

詳細

制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。
クレジット:
Seth McConnell / 寄稿者
報道写真番号:
461453174
コレクション:
Denver Post
作成日:
2015年01月07日(水)
アップロード日:
ライセンスタイプ:
リリース情報:
リリースされていません。 詳細情報
ソース:
Denver Post
オブジェクト名:
ZAA15EASTERSEALS_INSIDE
最大ファイルサイズ:
4256 x 2832 px (36.03 x 23.98 cm) - 300 dpi - 6 MB