Baihetan Hydropower Station Starts Full Operation

ZHAOTONG, CHINA - DECEMBER 20: Aerial view of the Baihetan hydropower station on December 20, 2022 in Zhaotong, Yunnan Province of China. Baihetan hydropower station started full operation as its No. 9 generating unit finished 72-hour trial operation on Tuesday. (Photo by VCG/VCG via Getty Images)
ZHAOTONG, CHINA - DECEMBER 20: Aerial view of the Baihetan hydropower station on December 20, 2022 in Zhaotong, Yunnan Province of China. Baihetan hydropower station started full operation as its No. 9 generating unit finished 72-hour trial operation on Tuesday. (Photo by VCG/VCG via Getty Images)
Baihetan Hydropower Station Starts Full Operation
ライセンスの購入
どんな用途に素材を使えますか?
¥19,800
JPY
Getty ImagesBaihetan Hydropower Station Starts Full Operation, ニュース写真Baihetan Hydropower Station Starts Full Operation, ニュース写真Baihetan Hydropower Station Starts Full Operation Getty Imagesでは、高品質、高解像度のニュース写真をご利用いただけますProduct #:1450870742
¥38,500¥11,000
Getty Images
In stock

詳細

制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。(CHINA OUT)
クレジット:
VCG / 寄稿者
報道写真番号:
1450870742
コレクション:
Visual China Group
作成日:
2022年12月20日(火)
アップロード日:
ライセンスタイプ:
リリース情報:
リリースされていません。 詳細情報
ソース:
Visual China Group
オブジェクト名:
vcg111415143157
最大ファイルサイズ:
5760 x 3840 px (48.77 x 32.51 cm) - 300 dpi - 5 MB