How Not to Build a Power Plant: a Cautionary Tale From Indonesia

Power lines hang from PT Perusahaan Listrik Negara (PLN) transmission towers in Pangkalan Susu, North Sumatra province, Indonesia, on Wednesday, April 8, 2015. For President Joko Widodo, a plan to build a $4 billion Japanese-Indonesian coal-fired power station presents a dilemma. He needs the electricity from new plants to power factories that would fuel growth and help rebalance the economy away from natural resources. At the same time, he needs to avoid alienating farmers and poor Indonesians who swept him into office last year. Photographer: Dimas Ardian/Bloomberg via Getty Images
Power lines hang from PT Perusahaan Listrik Negara (PLN) transmission towers in Pangkalan Susu, North Sumatra province, Indonesia, on Wednesday, April 8, 2015. For President Joko Widodo, a plan to build a $4 billion Japanese-Indonesian coal-fired power station presents a dilemma. He needs the electricity from new plants to power factories that would fuel growth and help rebalance the economy away from natural resources. At the same time, he needs to avoid alienating farmers and poor Indonesians who swept him into office last year. Photographer: Dimas Ardian/Bloomberg via Getty Images
How Not to Build a Power Plant: a Cautionary Tale From Indonesia
ライセンスの購入
どんな用途に素材を使えますか?
¥38,500
JPY

詳細

制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。For editorial use only. Additional clearance required for commercial or promotional use, contact your local office for assistance. Any commercial or promotional use of Bloomberg content requires Bloomberg's prior written consent.
クレジット:
Bloomberg / 寄稿者
報道写真番号:
472291860
コレクション:
Bloomberg
作成日:
2015年04月08日(水)
アップロード日:
ライセンスタイプ:
リリース情報:
リリースされていません。 詳細情報
ソース:
Bloomberg
オブジェクト名:
INDONESIA POWER 2
最大ファイルサイズ:
3900 x 2596 px (33.02 x 21.98 cm) - 300 dpi - 1 MB