Kyushu Electric Continues Installation of Fuel Rods at Second Reactor At Sendai Nuclear Plant

SATSUMASENDAI, JAPAN - SEPTEMBER 12: Nuclear fuel assemblies are transferred to the No. 2 reactor of the Sendai nuclear power plant on September 12, 2015 in Satsumasendai, Kagoshima, Japan. The utility intends to reactivate the reactor in mid-October and start commercial operations in mid-November. The reactor has an output of 890 megawatts. (Photo by The Asahi Shimbun via Getty Images)
SATSUMASENDAI, JAPAN - SEPTEMBER 12: Nuclear fuel assemblies are transferred to the No. 2 reactor of the Sendai nuclear power plant on September 12, 2015 in Satsumasendai, Kagoshima, Japan. The utility intends to reactivate the reactor in mid-October and start commercial operations in mid-November. The reactor has an output of 890 megawatts. (Photo by The Asahi Shimbun via Getty Images)
Kyushu Electric Continues Installation of Fuel Rods at Second Reactor At Sendai Nuclear Plant
制限付きの商品
このイメージのライセンスはオンラインでは発行できません。 このイメージのラインセンスをご希望の場合は、お問い合わせください。

詳細

制限:
商業目的またはプロモーション目的で使用する場合は、ゲッティ イメージズのオフィスへお問い合わせください。
クレジット:
The Asahi Shimbun / 寄稿者
報道写真番号:
488730038
コレクション:
The Asahi Shimbun
作成日:
2015年09月12日(土)
アップロード日:
ライセンスタイプ:
リリース情報:
リリースされていません。 詳細情報
ソース:
The Asahi Shimbun
オブジェクト名:
87107476
最大ファイルサイズ:
2709 x 4058 px (22.94 x 34.36 cm) - 300 dpi - 9 MB